Rules, Disclosures and Fine Print
Title insurance comes in two common forms, and the difference explains why a survey request can show up partway through a sale. The Department of Insurance guide says a standard policy insures mainly against defects discoverable in the public record, including defects due to lack of access to an open street. An extended policy also insures against defects, easements, encroachments and conflicts in boundary lines that the public records do not show. The guide says that because an extended policy covers many "off-record" defects, "the insurer will typically require a survey of the property to be insured." So a buyer who wants extended coverage, or whose lender wants it, may need a survey before closing. The guide also notes that optional endorsements, including one covering the accuracy of boundaries, are available at additional cost.
A record of survey is the map a surveyor files with the county surveyor after a field survey. Under Business and Professions Code section 8762, filing is generally optional. A surveyor must file a record of survey relating to land boundaries or property lines, however, when the field survey turns up any of five things:
- Material evidence or a physical change that does not appear on any prior subdivision map, official map, record of survey, or Bureau of Land Management map or record.
- A material discrepancy with those records, meaning a discrepancy in the position of points or lines, or in dimensions.
- Evidence that, by reasonable analysis, might result in materially alternate positions of lines or points shown on those records.
- The location, relocation, establishment, reestablishment or retracement of points or lines not shown on those maps, where the positions cannot be found by inspecting them.
- Points or lines set while surveying a parcel described in a recorded deed or other instrument of title that are not shown on any subdivision map, official map or record of survey.
Section 8762 also sets the timing. The record must be filed no later than 90 days after the setting of boundary monuments, or no later than 90 days after completion of the field survey, whichever occurs first. That period is extended when delays are beyond the surveyor's control, and in that case the surveyor sends the county surveyor a letter before the 90 days run out. After the county surveyor examines the record of survey, it is filed with the county recorder. What this means for a seller is that a filed record documents the survey and its findings in a public office where a buyer, a title company or a later owner can find it.
The BPELSG guide also says the law requires a land surveyor to use a written contract. That contract must describe the services, the basis of compensation and method of payment, the surveyor's name, address and license number along with the client's name and address, how additional services are handled, and how either party may end the contract.